Hyper-V Live Migration Fails While the VM Is Running
Before you begin
- Applies to:Live migration between two Windows Server 2025 Hyper-V hosts.
- Where to start:Start on the host that currently owns the VM. Compare its migration settings with the destination host. For graphical checks, use Desktop Experience or an approved Windows management workstation. Use PowerShell 7 or later unless a module requires Windows PowerShell.
- What you need:Have delegated access to both hosts. Confirm whether the VM is clustered and which migration transport is configured.
Guide tools
Troubleshooting Steps
Capture the failed direction and phase
Start hereRecord source and destination, VM ID, exact error, timestamp, and whether it failed before transfer, during transfer, or at destination startup. On a cluster, review the roleβs owner and migration status.
Compare migration settings on both hosts
Where to click
- In Hyper-V Manager, open each hostβs Hyper-V Settings β Live Migrations.
- Compare the intended networks and Advanced Features settings.
What to look for Β· Match allowed migration networks, performance option, simultaneous migration limits, and authentication model. Verify the target has the expected switch and capacity. Check CPU compatibility and VM configuration support if the failure points there.
Check the selected network and identity path
Verify name resolution and connectivity for the transport actually configured. Check the account and delegation model for the direction and management origin. For Kerberos failures, confirm the expected configuration with the identity owner. On Windows Server 2025, Credential Guard is enabled by default on eligible domain-joined non-DC servers and prevents CredSSP-based Hyper-V live migration. For standalone hosts using CredSSP after an upgrade, have the identity owner configure the supported Kerberos constrained delegation path. Keep Credential Guard enabled.
Check destination storage and correlate events
Compare Hyper-V VMMS and Worker logs on both hosts. For a cluster, include FailoverClustering events. Verify the named storage or share and target resource can be accessed according to the supported migration configuration. Apply one approved correction to the indicated dependency.
Verify a planned migration
VerifyMigrate an approved test or production workload in the intended direction. Confirm the target owns the running VM, guest connectivity survives as expected, and no new critical events appear. Test the reverse direction only when required.
Decide What to Do Next
| Finding | Next action |
|---|---|
| Error occurs before data transfer | Check authorization and destination preconditions. |
| Transfer starts then fails | Check the configured network path and destination capacity. |
| Role cannot activate at destination | Check storage, switch, and compatibility details in destination events. |
References
Your feedback keeps these production procedures accurate and battle-tested.